HMS Aial

Fitout

HMS Aial

HMS Aial

Occupation Date: August 2005 Client: HMSC AIAL Ltd

A s part of the Auckland International Airport arrivals and departure separation programme RCP were commissioned as fitout managers of the 5 new air side food outlets.

This new facility being designed and constructed in parallel with the base building construction works were completed in August 2005.

Tags: